Skip to main content

PUBLIC NOTICE | Air Quality General Permit Renewal for Concrete Batch Plants

Public Notice

Air Quality General Permit Renewal | Concrete Batch Plants

Revised On: Apr. 1st, 2025 - 09:17 am

On April 2, 2025, the comment period begins on the preliminary decision to renew the Air Quality General Permit for Concrete Batch Plants. The comment period ends May 2, 2025.

Permit Information:

A General Permit is a type of permit that applies to a class of sources. These permits contain requirements from the Federal Clean Air Act, Arizona Revised Statutes (A.R.S.) § 49-426, the Arizona Administrative Code, Title 18, Chapter 2 including applicable regulations from Maricopa, Pima, and Pinal Counties.

The Air Quality General Permit for Concrete Batch Plants is a renewal of the current permit. Facilities permitted under the Air Quality General Permit for Concrete Batch Plant will emit the following air contaminants: particulate matter with an aerodynamic diameter less than 10 microns (PM10), particulate matter with an aerodynamic diameter less than 2.5 microns (PM2.5), volatile organic compounds (VOCs), nitrogen oxides (NOx), sulfur dioxide (SO2), carbon monoxide (CO) and hazardous air pollutants (HAPs).

Review Documents:

  • Original Published Public Notice | View >
  • Draft Permit | View >
  • Draft Technical Support Document | View >  
  • In person at the ADEQ Record Center | Learn How >

Public Comment Period:

Dates: April 2, 2025 – May 2, 2025

Comments may be submitted as follows:

  • By Email | Email > 
  • By Mail (Must be postmarked or received by May 2, 2025):

ADEQ
Air Quality Division, Air Permits Unit
Attn: Karla Murrieta
1110 W. Washington St.
Phoenix, AZ  85007

Newly Posted Notices

Looking for a Public Notice?

ADEQ posts mandatory public notices in digital format on this webpage and hard copy notice boards located in the Phoenix Main Office and Southern Regional Office lobby areas | See Office Locations >